Yesterday's Report
8/16/2025-We didn’t have any guests join us on the run today. The flow from the dam continues at 185 cfs and out of Pineville just a slight increase to 216 cfs; water temperature taken at mid-day was 76 degrees F. The river restoration project here at the DSR is underway due to be completed NLT 1 September 2025. During this time frame fishing is closed from the Spring Hole downstream on both the North and South sides. We will put a notification out as soon as that projected has been completed.
84° / Clouds
Sunrise: 6:10am
Sunset: 8:07pm
216 CFS Pineville Gauge
185 CFS Dam Release
Clouds