Snow
29° / Snow
Sunrise 6:54am
Sunset 4:42pm
Snow
1310 CFS Pineville Gauge
1000 CFS Dam Release

August 16, 2025

8/16/2025-We didn’t have any guests join us on the run today.  The flow from the dam continues at 185 cfs and out of Pineville just a slight increase to 216 cfs; water temperature taken at mid-day was 76 degrees F. The river restoration project here at the DSR is underway due to be completed NLT 1 September 2025.  During this time frame fishing is closed from the Spring Hole downstream on both the North and South sides.  We will put a notification out as soon as that projected has been completed.

Clouds

84° / Clouds

Sunrise: 6:10am

Sunset: 8:07pm

216 CFS Pineville Gauge

185 CFS Dam Release

clouds

Clouds