With a substantial drop in flows over the past few days, hopes were high, but the fishing seemed tough for the handful of anglers that joined us today. Most anglers covered the greater part of the property today with flows down, allowing a bit more wading accessibility. Based on reports from these anglers today, the upper sections of the property were productive, but the lower section was the most productive today for most. The dam release is currently scheduled to remain at a 295 CFS release until 11:59 PM tomorrow (4/6). Please monitor safewaters.com/facility/lighthouse-hill for updated dam release scheduling.
38° / Rain
Sunrise: 6:38am
Sunset: 7:35pm
542 CFS Pineville Gauge
295 CFS Dam Release
Rain